home *** CD-ROM | disk | FTP | other *** search
/ Ron Blank & Associates 7 / Ron Blank & Associates 7.iso / big03a / big03a46.png < prev    next >
Portable Network Graphic  |  2003-07-24  |  196KB  |  700x525  |  16-bit (45,856 colors)
Labels: dirt | hakham | person | road | skateboard | sky | stairs | tree
OCR: Pre-molded bell footings Overview Below grade installation (continue] History of footings Development of ithe Bell Footing Pre-molded bell footings Review References TEST Step Five Step Six Step Seven Step Nine STEPS Install in hole Plurmb and level The tube must be braced if it extends 3 ft or more above grade If necessary have inspected by building inspector before backfilling Backfill. Avoid dropping or placing heaw rocks or heavy wet soil on the footing form .Pour concrete using footing form inverted on top of the construction tube as a funnel PREY 46 NEXT> moldec ifootings Developmen tootnas Beferences Plumb PREV